Lekir Bulk Terminal (LBT)
Terminal Information
Nature of Terminal Common User Port designed to handle dry bulk and liquid bulk. Gazzetted Customs Port.
Port Operation Working Hours 3 Shifts, 24 Hours Per Day, 365 Days Per Year.
Administrative Working Hours Mondays to Fridays 08:30 am - 17:00 pm
Saturdays 08:30 am - 12:00 noon
Closed Sundays and Public Holidays
Navigable Channel Directly off The Straits of Malacca
Minimum Depth 20m at all times
Berths South Berths
Length: 530m
Draft: 20m ACD

North Berths
Length: 250m
Draft: 18m ACD
Vessel / Size / Parameters Vessels / Maximum 180,000 DWT
Barges / Minimum 7,000 DWT
Services To Vessels Tuggage required, Pilotage compulsory
Port Agency available
Dry Bulk Facilities Unloading Equipment
2 Grab shipunloaders with 1,500 mt/hour rated capacities feeding 2 import conveyors, with each conveyor having 3,800 MT / hour rated capacity (inclusive of provision for extra grab unloader in future), integrated with a transfer station system with alternative routing capability.

Direct Transhipment Capability - Under Development
Direct transhipment at berth possible using existing unloaders for direct ship / barge to ship / barge transfer between north and south berths, tied in with open and covered storage area of total 200,000 sq. metres to be equipped with appropriate stock piling and reclaiming equipment for integration into existing transfer station system. Estimated storage capacity up to 1.5 million MT.

Ship Loading Capability - Under Development
Plans for future export berth for vessels / barges with 15m ACD water alongside, with export conveyors integrated with existing transfer station system. Loading rate of 2,500 MT / hour contemplated.

Mobile Equipment
Wheel loaders, dozers, mobile feed / stacker, etc. to suit requirements.
Liquid Bulk Facilities Pipeline wayleaves and tank areas available for direct vessel-to-plant / tank transfer by negotiation.